Shahin Pars Company.

Quality and Standard HVAC

Read More

About Us

Shahin Pars Company with years of excellent experience in the HVAC field, is recognized as one of the most reputable companies in this industry. By utilizing a specialized team and offering the best global brands, we provide unparalleled services to our customers.

Our Services

❄️

HVAC System Design

🏢

Building HVAC Installation

🔧

Repair & Maintenance

🔄

Renovation & Optimization

🏠

Residential Ventilation

⚙️

Industrial Ventilation

🔥

Heating Systems

🔌

Cooling Systems

Why Choose Us?

1

High Quality

2

Fast Installation

3

Valid Warranty

4

24/7 Support

Products & Brands

Our Projects

A selection of successful projects by Shahin Pars

A part of Shahin Pars Installation Company's resume is provided to you.

A part of Shahin Pars Installation Company's resume is provided to you.

- - 1395

Read More

A part of Shahin Pars Installation Company's resume is provided to you.

1. Implementation of the Municipality of Region One facilities including absorption chiller - engine room - Fan coil of Municipality of Region One 2/95 to 6/95 2. Implementation of the facilities of the Technical Faculty of Azad University, Pardis, engine room - fire department - water supply - polyethylene - installation and commissioning of 5 air washers (air conditioners) 5/95 to 8/95 3. Implementation of the facilities of the Navy Training Area including: Radiator piping - installation of diesel engine room radiator and 7/95 to 9/95 4. Implementation of the Kerman Air Defense facilities including: Central engine room, condenser unit. 2/96 to 5/96 5. Implementation of the facilities of Ater Sib Hotel, installation of radiator - engine room and treatment plant 1/95 to 2/95 6 - Implementation of Negin Sports Pool Facilities Implementation of pool, jacuzzi, sauna, engine room and treatment plant plumbing 7 - Implementation of Salehi Pool Facilities Implementation of pool, jacuzzi, sauna, engine room and treatment plant plumbing 8 Mr. Azadikhah 10 units of sewage and hot and cold piping and design, construction and installation of air conditioners Bahar 1 9 Mr. Azadikhah 6 units of sewage and hot and cold piping and design, construction and installation of air conditioners Bahar 3 10 Mr. Vahid Nouri 21 units of sewage and hot and cold piping Duct Split Cooling and Heating System 11 Mr. Rahim Nouri 10 units of sewage and hot and cold piping and design, construction and installation of air conditioners 12 Mr. Talebi Restaurant sewage and hot and cold piping and design, construction and installation of air conditioners 13 Mr. Fattahi Duplex Sewerage and Heating and Cooling Piping and Design, Construction and Installation of Air Conditioners 14 Mr. Behnia Triplex Sewerage and Heating and Cooling Piping and Design, Construction and Installation of Air Conditioners 15 Mr. Shahba 20-unit Mini Chiller and Fan Coil Cooling and Heating System with Amiran Piping 16 Mr. Afshar Air Conditioners 17 Mr. Amiri Moghadam 12-unit Duct Split Cooling and Heating System 18 Justice Chiller - Fan Coil - Motor House and Air Washer 1 Kerman Faculty of Medical Sciences, all mechanical and electrical installations for 6 years with a letter of consent 2 Gohar Zamin, air conditioning system, rooftop package, condensing unit and split 3 Mehrdad 1 to 7, total units 70 units, duct split system, air washer, water and sewage piping

- - 1395
0 m²
Area
120
Months
Negin Swimming Pool and Sports Complex, all plumbing work for the pool, draining and cleaning the sauna and jacuzzi, motor home and cleaning the house

Negin Swimming Pool and Sports Complex, all plumbing work for the pool, draining and cleaning the sauna and jacuzzi, motor home and cleaning the house

- - 1395

Read More

Negin Swimming Pool and Sports Complex, all plumbing work for the pool, draining and cleaning the sauna and jacuzzi, motor home and cleaning the house

Design, construction and implementation of swimming pools, saunas and jacuzzis, sewage and hot and cold water piping, and installation of split cooling systems and radiator heating systems.

- - 1395
1600 m²
Area
4
Months
Mr. Amiri Moghadam, split duct cooling and heating system, polyethylene sewage piping, and five-layer hot and cold piping

Mr. Amiri Moghadam, split duct cooling and heating system, polyethylene sewage piping, and five-layer hot and cold piping

- - 1396

Read More

Mr. Amiri Moghadam, split duct cooling and heating system, polyethylene sewage piping, and five-layer hot and cold piping

Design and installation of 36000 General Split Duct, 12 units, design and implementation of polyurethane channels, implementation of all plumbing and installation of valves

- - 1396
1100 m²
Area
3
Months
Salehi swimming pool, plumbing, filling, draining and filtration, sauna and jacuzzi, motor home and filtration house

Salehi swimming pool, plumbing, filling, draining and filtration, sauna and jacuzzi, motor home and filtration house

- - 1400

Read More

Salehi swimming pool, plumbing, filling, draining and filtration, sauna and jacuzzi, motor home and filtration house

Plumbing of all swimming pools, jacuzzis and saunas, design and installation of motor homes and sewage treatment plants, installation and commissioning of jacuzzis, installation and commissioning of environmental cooling and heating systems.

- - 1400
1000 m²
Area
3
Months
Industrial School of Installation and Commissioning of Compression Chiller

Industrial School of Installation and Commissioning of Compression Chiller

- - 1398

Read More

Industrial School of Installation and Commissioning of Compression Chiller

Installation and commissioning of a compression chiller for cooling the industrial college building

- - 1398
4500 m²
Area
3
Months
Yasha Building, design, construction and installation of split ducts, sewage and hot and cold plumbing and installation of sanitary valves

Yasha Building, design, construction and installation of split ducts, sewage and hot and cold plumbing and installation of sanitary valves

- - 1399

Read More

Yasha Building, design, construction and installation of split ducts, sewage and hot and cold plumbing and installation of sanitary valves

Polyethylene sewage piping, five-layer hot and cold piping, copper piping for split ducts, and design and construction of polyurethane channels - installation of valves and installation and commissioning of split duct heating and cooling systems

- - 1399
1100 m²
Area
3
Months
Sardar residential building, design, construction and installation of split, sewage and hot and cold plumbing

Sardar residential building, design, construction and installation of split, sewage and hot and cold plumbing

- - 1399

Read More

Sardar residential building, design, construction and installation of split, sewage and hot and cold plumbing

Water, radiator and sewage piping, radiator installation, split system installation, valve installation

- - 1399
1100 m²
Area
2
Months
Mehrdad 6 office building, design, construction and installation of split duct, sewage and hot and cold plumbing and installation of sanitary valves

Mehrdad 6 office building, design, construction and installation of split duct, sewage and hot and cold plumbing and installation of sanitary valves

- - 1400

Read More

Mehrdad 6 office building, design, construction and installation of split duct, sewage and hot and cold plumbing and installation of sanitary valves

Design and construction of polyurethane channels, installation of cooling and heating split ducts, installation of all valves and water and sewage piping, and copper pipes of split ducts

- - 1400
1800 m²
Area
2
Months
Mehrdad Building 5 (hot and cold sewage piping and cooling and heating system)

Mehrdad Building 5 (hot and cold sewage piping and cooling and heating system)

- - 1397

Read More

Mehrdad Building 5 (hot and cold sewage piping and cooling and heating system)

Hot and cold plumbing, sewage and ventilation, radiator plumbing and radiator installation and split cooling system, sanitary valve installation

- - 1397
1600 m²
Area
2
Months
Mehrdad 4 Building, design and plumbing of sewage, hot and cold plumbing, and GREE split duct

Mehrdad 4 Building, design and plumbing of sewage, hot and cold plumbing, and GREE split duct

- - 1397

Read More

Mehrdad 4 Building, design and plumbing of sewage, hot and cold plumbing, and GREE split duct

Cold and hot water piping or five-layer pipes, design and installation of polyurethane channels and duct split cooling and heating systems

- - 1397
1200 m²
Area
2
Months
Mehrdad 1 residential building, design, construction and installation of sewage, hot and cold plumbing, and split water coolers

Mehrdad 1 residential building, design, construction and installation of sewage, hot and cold plumbing, and split water coolers

- - 1396

Read More

Mehrdad 1 residential building, design, construction and installation of sewage, hot and cold plumbing, and split water coolers

Bush-fit sewage piping, hot and cold water piping and heating radiators, copper piping for split cooling

- - 1396
1200 m²
Area
2
Months
Spring 3 Design, construction and installation of building, sewage and hot and cold plumbing and air washer

Spring 3 Design, construction and installation of building, sewage and hot and cold plumbing and air washer

- - 1395

Read More

Spring 3 Design, construction and installation of building, sewage and hot and cold plumbing and air washer

10-unit sewage, water, ventilation piping project, air washer channel design, apartment air washer installation

- - 1395
1600 m²
Area
1
Months
Bahar 2 Residential Building Design, construction and installation of building, sewage and hot and cold plumbing and air washer

Bahar 2 Residential Building Design, construction and installation of building, sewage and hot and cold plumbing and air washer

- - 1395

Read More

Bahar 2 Residential Building Design, construction and installation of building, sewage and hot and cold plumbing and air washer

PVC sewage piping, single-layer P.P.T cold and hot water piping, design, construction and installation of air washer cooling and heating systems

- - 1395
1400 m²
Area
1
Months
Mehrdad Building (hot and cold sewage piping)

Mehrdad Building (hot and cold sewage piping)

- - 1397

Read More

Mehrdad Building (hot and cold sewage piping)

Hot and cold plumbing with five-layer PVC sewage pipes

- - 1397
1400 m²
Area
40
Months
Municipality (installation and commissioning of cooling, heating and hot water engine houses)

Municipality (installation and commissioning of cooling, heating and hot water engine houses)

- - 1397

Read More

Municipality (installation and commissioning of cooling, heating and hot water engine houses)

Installation and operation of 2 absorption chillers for cooling and installation of cooling towers and all fan coil piping equipment - fan coil installation

- - 1397
2800 m²
Area
4
Months
Technical Faculty (Polyethylene Sewage Piping and Hot and Cold Water Supply)

Technical Faculty (Polyethylene Sewage Piping and Hot and Cold Water Supply)

- - -1396

Read More

Technical Faculty (Polyethylene Sewage Piping and Hot and Cold Water Supply)

Sewage piping with full vent polyethylene pipes and hot and cold water supply with polypropylene pp pipes

- - -1396
3200 m²
Area
1
Months
Technical Faculty (Installation and commissioning of heating and hot water engines)

Technical Faculty (Installation and commissioning of heating and hot water engines)

- - 1396

Read More

Technical Faculty (Installation and commissioning of heating and hot water engines)

Installation of a heating engine room system and piping to rooftop air washers to supply hot air to the complex and installation and commissioning of a hot water system for toilets and bathrooms

- - 1396
3200 m²
Area
3
Months
Technical Faculty (Installation and commissioning of air washer)

Technical Faculty (Installation and commissioning of air washer)

- - 1396

Read More

Technical Faculty (Installation and commissioning of air washer)

Installation and commissioning of 5 air washers supporting cooling and heating to supply cold and hot air and transfer it through ducts to the building.

- - 1396
3200 m²
Area
3
Months
18+
Successful Projects

Contact Us

📍

Address

Fars, Sadra New Town, Phase 1, Dena Boulevard, Morvarid Passage, 3rd Administrative Floor, Unit 69

📞

Phone

+98-7136410803

✉️

Email

info@shahin-pars.com

Contact Us

📍 Fars, Sadra New Town, Phase 1, Dena Boulevard, Morvarid Passage, 3rd Administrative Floor, Unit 69
📞 +98-7136410803
✉️ info@shahin-pars.com